In-product feedback that drives your next decision
Vantage connects Sprig to your product workflow so in-product surveys, NPS responses, and user sentiment ground every PRD in real-time user feedback.
NPS: 32 (down from 48)
“Checkout loads slow on mobile. Almost abandoned my cart twice.”
Mobile checkout sentiment declining
Mobile checkout NPS dropped 16 pts
Correlated with v2.4 release. 34 responses cite loading speed.
Mobile performance is top detractor driver
28% detractor rate. Recommend hotfix PRD with R-0 urgency.
Three steps to feedback-driven PRDs
Connect Sprig and let in-product sentiment guide your product priorities.
Connect your Sprig account
Authorize via API key. Vantage reads your survey data and responses without modifying your Sprig studies.
Select studies to sync
Choose which surveys and feedback studies flow into Vantage. New responses sync automatically as they come in.
Real-time feedback in decisions
Sentiment shifts, NPS trends, and user verbatims become context for every PRD. Requirements respond to what users experience in-product.
Built for product-led growth teams
In-product signals as decision context. Ship what users need, validated at the moment of experience.
Contextual feedback mapping
Sprig captures feedback at specific product moments. Vantage preserves that context, linking survey responses to exact flows so requirements reference where users actually struggle.
Sentiment trend tracking
NPS and sentiment scores over time feed into your PRD context. Vantage surfaces regressions tied to specific releases so you catch experience drops early.
AI-powered response clustering
Open-text responses from Sprig surveys are automatically clustered into actionable themes. Requirements reference user sentiment patterns, not individual replies.
Continuous feedback loop
New Sprig responses sync in real time. As feedback accumulates, Vantage updates product signals automatically. Your context stays current without manual intervention.
Enterprise-grade security by default
Your user feedback data is sensitive. We treat it that way.
Strict Data Privacy
We do not use customer survey data to train AI models. Your user feedback stays yours.
Encryption In Transit and At Rest
All data transferred between Sprig and vantageOS is encrypted using TLS 1.2+ and stored securely using AES-256.
Access Audits and Compliance
We align with GDPR, HIPAA, and SOC2 security guidelines to manage workspace access roles rigorously.
Explore more
Frequently asked questions
Start using Sprig with Vantage
Connect your Sprig account in under 2 minutes. In-product feedback grounding every decision.
Turn your customer notes into what to build next.
Paste a call transcript, support thread or feedback dump. Vantage extracts the signals and themes in about 30 seconds.
Free to start. No credit card required.