Survey data that actually shapes your product
Vantage connects Typeform to your product workflow so survey responses, NPS scores, and user feedback ground every PRD in what users actually said.
NPS Score: 47
“Export takes too long. Need bulk export and scheduled reports.”
Top: API access (67%), SSO (54%)
Export/reporting pain (23 mentions)
Strongest detractor driver. Correlated with 15% NPS drop since Q3.
API access ranks #1 across all surveys
67% of feature survey + 12 open-text mentions. Recommend R-1 priority.
Three steps to research-grounded PRDs
Connect Typeform and let user feedback drive your product requirements.
Connect your Typeform account
Authorize via OAuth in one click. Vantage accesses your forms and responses without storing credentials.
Select forms to sync
Choose which surveys, NPS forms, and feedback forms flow into Vantage. New responses sync automatically.
User voices in every decision
Survey themes, NPS trends, and verbatim feedback become part of your product context. Requirements cite real user data.
Built for user research and survey data
Survey responses as product context. Not a spreadsheet, a decision engine.
Response theme clustering
Open-text responses are automatically clustered into themes. Vantage surfaces the strongest patterns so you see what users care about most, not just individual replies.
NPS and CSAT trend analysis
Score distributions and trends flow into your PRD context. Vantage correlates score changes with specific feedback themes to explain why satisfaction shifted.
Verbatim citations in PRDs
Generated requirements can reference exact user quotes from survey responses. Stakeholders see the voice of the customer, not just a summary.
Continuous feedback loop
New responses sync automatically. As more data comes in, Vantage updates theme clusters and signals so your product context stays current without manual re-imports.
Enterprise-grade security by default
Your user research data is sensitive. We treat it that way.
Strict Data Privacy
We do not use customer survey data to train AI models. Your user research stays yours.
Encryption In Transit and At Rest
All data transferred between Typeform and vantageOS is encrypted using TLS 1.2+ and stored securely using AES-256.
Access Audits and Compliance
We align with GDPR, HIPAA, and SOC2 security guidelines to manage workspace access roles rigorously.
Explore more
Frequently asked questions
Start using Typeform with Vantage
Connect your Typeform workspace in under 2 minutes. Survey data grounding every product decision.
Turn your customer notes into what to build next.
Paste a call transcript, support thread or feedback dump. Vantage extracts the signals and themes in about 30 seconds.
Free to start. No credit card required.